AbstractsBusiness Management & Administration

Problem for examination

by Herman H. Schwarz




Institution: Missouri University of Science and Technology
Department:
Year: 1888
Record ID: 1486545
Full text PDF: http://hdl.handle.net/10355/26095


Abstract

"It is required to furnish plans, specifications and estimate for a Flintshire furnace, capable of smelting 2100 pounds of good galena, per shift of 8 hours. Give two drawings showing elevation and plan, drawn to a scale of 1/2 inch to the foot. Fire brick, [led] brick and iron to be shown in colors. Estimates must cover both iron and brick work" – Problem to be Solved, p. [2].