Abstracts Engineering

Add abstract

Want to add your dissertation abstract to this database? It only takes a minute!

Search abstract

Search for abstracts by subject, author or institution

Share this abstract

Hungry Bob Harvest Production Study : mechanical thinning for fuel reduction in the Blue Mountains of northeast Oregon

by Elizabeth Dodson Coulter

Institution: Oregon State University
Department: Forest Engineering
Degree: MS
Year: 1999
Keywords: Fuel reduction (Wildfire prevention)  – Blue Mountains (Or. and Wash.)
Posted:
Record ID: 1701609
Full text PDF: http://hdl.handle.net/1957/9489


Abstract

Fire exclusion in the western U.S.A. has caused fuel loads to build up and overall forest health to decline. Managers are now looking for ways to reduce these fuel loads while reintroducing some of the desired effects of natural wildfire. One method to do this is thinning using mechanical harvesting methods to reduce fuel loads. This study looks at mechanical thinning in ponderosa pine (Pinus ponderosa) and Douglas-fir (Pseudotsuga menziesii) stands in the Blue Mountains of Northeastern Oregon. A 409 acre (165.5 ha) unit of 7.1 inch (18 cm) average diameter at breast height was studied during the summer of 1998. Three feller-bunchers and three forwarders were observed in this cut-to-length (shortwood) operation. The three feller-bunchers were a Rottne SMV Rapid EGS, John Deere 653E, and a Caterpillar 320L Excavator, and three forwarders were a Timbco TF8 15-C, Rottne SMV Rapid, and a Rottne Rapid. These six machines operated on 409 acres (165.5 ha) removing a total of 15,786 tons (14,320 metric tons), 73.4% as sawlogs with the remaining 26.6% as pulp. Felling and processing costs for the three feller-bunchers were $5.20/ton (5.35 euros/mton) for the Rottne, $6.63/ton (6.83 euros/mton) for the John Deere, and $7.97/ton (8.21 euros/mton) for the Caterpillar Excavator. Forwarding costs were $7.12/ton (7.33 euros/mton) for the Timbco, $7.61 (7.83 euros/mton) for the Rottne SMV Rapid, and $7.58/ton (7.80 euros/mton) for the Rottne Rapid. Total stump-to-landing costs ranged from $12.27/ton to $15.81/ton (12.63 to 16.28 euros/ton).

Add abstract

Want to add your dissertation abstract to this database? It only takes a minute!

Search abstract

Search for abstracts by subject, author or institution

Share this abstract

Relevant publications

Book cover thumbnail image
Predicting the Admission Decision of a Participant...
by Yigit Ozsert, Gozde
   
Book cover thumbnail image
Development of New Models Using Machine Learning M...
by Akgol, Derman
   
Book cover thumbnail image
The Adaptation Process of a Resettled Community to... A Study of the Nubian Experience in Egypt
by Fahmi, Wael Salah
   
Book cover thumbnail image
Development of an Artificial Intelligence System f...
by Chand, Praneel
   
Book cover thumbnail image
Theoretical and Experimental Analysis of Dissipati...
by Latour, Massimo
   
Book cover thumbnail image
Optical Fiber Sensors for Residential Environments
by García-Olcina, Raimundo
   
Book cover thumbnail image
Calibration of Deterministic Parameters Reassessment of Offshore Platforms in the Arabian ...
by Zaghloul, Hassan
   
Book cover thumbnail image
How Passion Relates to Performance A Study of Consultant Civil Engineers
by Cadieux, Trevor J.