Abstracts Physics

Add abstract

Want to add your dissertation abstract to this database? It only takes a minute!

Search abstract

Search for abstracts by subject, author or institution

Share this abstract

Economic Analysis of a Data Center Virtual Power Plant Participating in Demand Response

by Labi Bajracharya

Institution: South Dakota State University
Year: 2016
Keywords: data center energy management; demand response; locational marginal pricing; network congestion; optimization; virtual power plant; Electrical and Computer Engineering; Power and Energy
Posted: 02/05/2017
Record ID: 2091623
Full text PDF: http://openprairie.sdstate.edu/etd/1058


Abstract

Data centers consume a significant amount of energy from the grid, and the number of data centers are increasing at a high rate. As the amount of demand on the transmission system increases, network congestion reduces the economic efficiency of the grid and begins to risk failure. Data centers have underutilized energy resources, such as backup generators and battery storage, which can be used for demand response (DR) to benefit both the electric power system and the data center. Therefore, data center energy resources, including renewable energy, are aggregated and controlled using an energy management system (EMS) to operate as a virtual power plant (VPP). The data center as a VPP participates in a day-ahead DR program to relieve network congestion and improve market efficiency. Data centers mostly use lead-acid batteries for energy reserve in Uninterruptible Power Supply (UPS) systems that ride through power fluctuations and short term power outages. These batteries are sized according to the power requirement of the data center and the backup power duration required for reliable operation of the data center. Most of the time, these batteries remain on float charge, with seldom charging and discharging cycles. Batteries have a limited float life, where at the end of the float life, the battery is assumed dead, and require replacement. Therefore, the unused energy of the battery can be utilized by allocating a daily energy budget limit without affecting the overall float life of the battery used in data center for the purpose of DR. This is incorporated as a soft constraint in the EMS model, and the extra use of battery energy over the daily budget limit will account for the wear cost of the battery. A case study is conducted in which the data center is placed on a modified version of the IEEE 30-bus test system to evaluate the potential economic savings by participating in the DR program, coordinated by the Independent System Operator (ISO). We show that the savings of the data center operating as a VPP and participating in the DR program far outweighs the additional expense due to operating its own generators and batteries. Advisors/Committee Members: Timothy M Hansen.

Add abstract

Want to add your dissertation abstract to this database? It only takes a minute!

Search abstract

Search for abstracts by subject, author or institution

Share this abstract

Relevant publications

Book cover thumbnail image
The Census of Warm Debris Disks in the Solar Neigh...
by Patel, Rahul I.
   
Book cover thumbnail image
Neutron Stars and NuSTAR A Systematic Survey of Neutron Star Masses in High...
by Bhalerao, Varun B.
   
Book cover thumbnail image
Functional Domain Motions and Processivity in Bact... A Molecular Dynamics Study
by Joshi, Harshad
   
Book cover thumbnail image
The Kiloparsec-Scale Structure and Kinematics of H...
by Law, David R.
   
Book cover thumbnail image
The Manufacture of High Temperature Superconductin...
by Richardson, Kurt A.
   
Book cover thumbnail image
An Improved Form for the Electrostatic Interaction...
by Sushkin, Nicholas V.
   
Book cover thumbnail image
Electronic and Optical Properties of Semiconductor... A Study Based on the Empirical Tight Binding Model
by Lew Yan Voon, Lok C.